Headbox Replacement
Menominee, MI
Industry: Pulp and Paper
Project Scope
CR Meyer was contracted by the equipment manufacturer to replace the headbox on Paper Machine #2 at a customer in Menominee, Michigan. The scope of work included replacing the headbox and installing new primary and dilution screens, attenuator, save-all pans, flume, and new platforms, walkways, and stairs. CR Meyer designed the monorails, platforms, walkways, and stairs.
Project Stats
- Self-performed: Civil, Structural, Millwrighting, and Pipe Installation
- Steel: 10 Tons
- Concrete: 400 Cubic Yards
- Pipe: 2,000 Feet