Feasibility
Studies
Evaluate viability, define scope, and establish realistic budgets before committing to design or construction.
Search
Evaluate viability, define scope, and establish realistic budgets before committing to design or construction.
One integrated team from concept through completion, with no gaps between design and execution.
Our own craftspeople execute the work. No subcontractors, no variance in quality or accountability.
The same crews and safety culture from your capital projects, keeping your facility running in between.
CR Meyer's name on the project means CR Meyer's people doing the work. One accountable team, start to finish.
OSHA VPP Star-level safety isn't a program. It's how every crew operates, every day.
Decades of experience executing complex projects in facilities that never stop running.
Where CR Meyer invests in the next generation of craft and project leadership.
135+ years of industrial construction, built on doing the work ourselves.
Our team is ready to help you plan, design, and build with confidence.
Since 1888, grown from a regional trades contractor into one of the top industrial contractors in the country.
The experienced leaders and craftspeople behind every CR Meyer project.
Midwest-based facilities, positioned to serve industrial clients wherever the work takes us.
Trades, engineering, and project management opportunities with a contractor that invests in its people.
High-throughput operations, heavy and abrasive equipment, continuous material flow, and maintenance demands that don't pause for convenience. CR Meyer understands what scrap & recycling facilities actually require from a contractor, and we're equipped to deliver it.
Scrap processing and recycling facilities operate under conditions that expose the limitations of contractors who aren't prepared for them. The equipment is heavy, the materials are abrasive, and the operational tempo is relentless. Shredders, balers, cranes, conveyors, and material handling systems run hard — and when they go down, throughput stops.
A scrap yard isn't a standard industrial site. Contractors who treat it like one create hazards before the first tool is unpacked.
Shredders, balers, and material handling cranes require specific mechanical knowledge. Without it, installations fail early and alignments drift under operating loads.
CR Meyer has worked in demanding industrial environments for more than 135 years. Scrap & recycling facilities are not a new context for us — they are exactly the kind of high-throughput, active industrial environment our model is built for.
Heavy scrap processing equipment demands foundations designed for the loads it generates. CR Meyer's concrete crews place equipment foundations, housekeeping pads, and structural pours, coordinated directly with the installation sequence to ensure foundations are ready when equipment arrives.
In a scrap processing facility, the margin between a well-managed installation and a throughput problem is narrow. Equipment goes down, the replacement window opens, and every hour the new system isn't running is an hour of lost material flow.
A contractor who introduces coordination delays — between trades, between the demo crew and the installation crew, between the foundation and the equipment arriving on site — turns a planned replacement into an unplanned production event.
CR Meyer's self-perform model removes those delays at the source.
And because our trades coordinate internally, that execution happens without disrupting the processing lines running alongside the work.
Scrap & recycling facilities carry real safety risks: crane operations, heavy material movement, rotating and crushing equipment, and the hazards of working in an environment where material is constantly moving. CR Meyer's self-perform safety culture is especially relevant here:
Complex doesn't intimidate us. Active facilities, tight shutdowns, multi-trade coordination, high-stakes capital projects … this is the work we're built for.
Demolition
Our hydro/power customer needed to replace aging generating units at their Iron Mountain hydroelectric facility with a modern, higher-capacity powerhouse — a $64 million project that combined heavy civil construction, precision turbine installation, and complex waterfront work on an active energy site.
Demolition
Demolition
Let's talk about the equipment, the timeline, and what CR Meyer can bring to your facility.
Whether you're replacing major processing equipment, expanding your facility, or looking for a maintenance partner who understands the demands of a high-throughput recycling operation, CR Meyer has the trades and the experience to handle it. Tell us about your project and we'll put the right team together.