Waco, TX

Coated Recycled Paperboard Mill: 119-Acre Campus Build and CRB Machine Installation in Waco, Texas

Project Summary

A manufacturer needed more than a contractor to install a new coated recycled paperboard (CRB) machine. They needed a partner to build an entire 119-acre production campus from the ground up, and deliver it at scale.

Key Challenges: Building a Complete Facility, Not Just Installing Equipment

The project required full site preparation — roads, rail service, fresh water supply, fire protection, and security — before a single building could go up. Six major structures had to be designed, built, and made ready to receive highly specialized paper manufacturing equipment, all on a schedule that left no margin for coordination failures between trades.

Solution

CR Meyer self-performed the critical trades across the entire campus, managing civil, structural, mechanical, electrical, and piping scopes under one accountable team. The Fiber Prep System and new Coated Paperboard Machine were installed with the precision that paper machine work demands, connected to a fully operational facility built to support decades of production.

Keys to Success

Early contractor engagement: CR Meyer’s involvement began at site selection and carried through to final checkout, giving the project team the foresight to solve problems before they became delays and ensuring every decision was made with constructability in mind.

Ingenuity: When the project demanded it, CR Meyer’s team found better ways. RCC concrete addressed the scale and pace of major roadway pours, while a material and equipment delivery system — adapted for the jobsite — brought real-time visibility to tools and consumables across a workforce of 1,500+ field personnel.

Collaboration: A project of this magnitude required people from everywhere. Tradespeople came from over 48 states, and CR Meyer’s ability to integrate that workforce into a single, coordinated team was central to delivering 3 million-plus manhours without losing alignment across trades.

Project Stats

  • 640,000 SF of production and warehousing facilities
  • 94,000 CY of concrete
  • 11,000 tons of steel
  • 164,928 LF of fabricated pipe
  • 380,200 LF of overall pipe and tube
  • 1,500+ field personnel
  • 3 million+ manhours
Topics
Pulp & Paper Concrete Electrical Pipe Fabrication Piping