Feasibility
Studies
Evaluate viability, define scope, and establish realistic budgets before committing to design or construction.
Search
Evaluate viability, define scope, and establish realistic budgets before committing to design or construction.
One integrated team from concept through completion, with no gaps between design and execution.
Our own craftspeople execute the work. No subcontractors, no variance in quality or accountability.
The same crews and safety culture from your capital projects, keeping your facility running in between.
CR Meyer's name on the project means CR Meyer's people doing the work. One accountable team, start to finish.
OSHA VPP Star-level safety isn't a program. It's how every crew operates, every day.
Decades of experience executing complex projects in facilities that never stop running.
Where CR Meyer invests in the next generation of craft and project leadership.
135+ years of industrial construction, built on doing the work ourselves.
Our team is ready to help you plan, design, and build with confidence.
Since 1888, grown from a regional trades contractor into one of the top industrial contractors in the country.
The experienced leaders and craftspeople behind every CR Meyer project.
Midwest-based facilities, positioned to serve industrial clients wherever the work takes us.
Trades, engineering, and project management opportunities with a contractor that invests in its people.
Pile Driving Expertise
Foundation work is where industrial projects either start strong or carry problems forward for the rest of the schedule. CR Meyer pile driving crews bring the field experience, equipment, and coordination discipline to execute deep foundation projects correctly — so the structures and equipment built on top of them perform as designed for the long term.
Pile driving and deep foundation work carries consequences that extend well beyond the foundation phase. Equipment installed on foundations not driven to proper depth or bearing capacity will underperform and fail prematurely. Getting this work right isn't just a schedule consideration — it's a project integrity decision.
The handoff from foundation work to concrete and structural phases is where disconnected teams create problems that follow a project for years.
Pile driving has to be completed before concrete foundations can be formed and poured. Foundation layouts have to match the mechanical and structural requirements of what goes above them. When pile driving is handled by a subcontractor working independently, layouts don't always match, documentation gaps slow down the next phase, and accountability for foundation conditions is divided.
CR Meyer performs pile driving with its own workforce — part of the same self-perform model that governs our concrete, ironwork, and structural scopes. Foundation layouts are verified against structural and mechanical requirements before work begins. The handoff to concrete is managed within one team.
Pile locations and depths are confirmed against structural and equipment requirements from the start.
The transition from foundation to concrete and structural phases is managed within one accountable project team.
Foundation records are thorough and available for every phase that depends on them.
The team driving the piles is coordinated with the team pouring the concrete above them.
When the crew driving piles answers to a different contractor than the one pouring the concrete and erecting the steel, alignment between those scopes depends on communication that doesn't always happen at the right time. CR Meyer's foundation crews are part of the same project team, so the handoff from ground-up to structure isn't really a handoff at all. It's a continuation.
Paper machine foundations, press section piling, and deep foundation support for mill expansions require pile driving coordinated with concrete and structural scopes in facilities where the equipment above the foundation runs continuously.
Crusher foundations, processing plant piling, and deep foundation support for mineral processing equipment require load-bearing capacity matched to the dynamic forces these machines generate in operation.
Turbine and generator foundations in power generation facilities require precision pile driving coordinated with the structural and mechanical installation that follows — foundation errors at this scale are not correctable after the fact.
New building foundations, equipment pads requiring deep support, and facility expansions across heavy manufacturing depend on pile driving that transitions cleanly to concrete and structural phases without rework.
Foundation work for process vessels, structural support systems, and facility expansions in refineries requires pile driving that accounts for soil conditions, load requirements, and the coordination demands of working in a regulated process environment.
What gets driven into the ground determines how reliably everything above it performs. These projects reflect how CR Meyer's pile driving capability established the conditions for project success.
Pile Driving
Our hydro/power customer needed to replace aging generating units at their Iron Mountain hydroelectric facility with a modern, higher-capacity powerhouse — a $64 million project that combined heavy civil construction, precision turbine installation, and complex waterfront work on an active energy site.
Pile Driving
Let's talk about the scope, the site conditions, and how CR Meyer can build a strong start for everything that follows.
Whether you're planning a major equipment installation that requires deep foundation support, managing a facility expansion on a challenging site, or looking for a contractor who can carry foundation work through to concrete and structural phases under one project team, CR Meyer has the capability and experience to deliver. Tell us about your project and we'll put the right team together.