Cogeneration Project
Fullerton, CA
Industry: Pulp and Paper
Project Scope
A California facility needed to produce full power on-site for the total operation of the paper mill, including two paper machines and converting facilities. This included installation of 15 megawatt gas turbine, natural gas compressors, 2.5 megawatt steam turbine and condenser, reverse osmosis system, heat recovery steam generator.
With an extremely tight budget and project schedule, CR Meyer went straight to work by providing budgeting, scheduling, cost control, and construction management. All work, except for CR Meyer self-perform work, was competitively bid and done on a lump sum basis to maintain cost control. CR Meyer was challenged with minimizing interference and downtime with mill operations while working with the local utility to tie the new electrical into the mill’s operating system. In less than 72 hours, CR Meyer was able to tie the new operating system into the existing substation.