Project Summary
This mining project required construction across two distinct sites in Michigan’s Upper Peninsula — a historic mill renovation and an all-new mine facility — simultaneously, in one of the most demanding winter climates in the Midwest.
- Duration
- 23 months
Key Challenges: 2 Sites, 1 Team, One of the Harshest Winters on Record
The Humboldt Mill Site renovation required removing and replacing 160,000 square feet of siding and roofing on the concentrator building — a massive envelope project on a historic structure. New fine ore bins had to be pre-assembled and welded together on the ground inside a temporary shelter, then set in place using a 1,400-ton crawler crane. At the Big Bay Mine Site, CR Meyer placed 8,400 cubic yards of concrete and erected 60,000 square feet of new structures, including a coarse ore storage building, aggregate storage buildings, a portal ventilation system, and a concrete batching plant. All of this had to be executed during the brutally cold winter of the Upper Peninsula, when temperatures and conditions regularly threatened schedule and safety.
Solution
CR Meyer served as General Contractor across both sites, coordinating civil, structural, mechanical, and specialty scope work in parallel. The team engineered a ground-level pre-assembly strategy for the fine ore bins — welding them together in a temporary shelter before a precision 1,400-ton crawler crane pick — to safely manage both the scale of the equipment and the risks of winter installation. Despite the extreme conditions, CR Meyer met every project deadline.
Keys to Success
Dual-site general contracting: Managing simultaneous construction at the Humboldt Mill Site and Big Bay Mine Site required two coordinated project teams operating under one accountable GC — keeping both schedules aligned and resources efficiently deployed.
Heavy lift ingenuity: Pre-assembling the fine ore bins at grade in a temporary shelter before the crawler crane pick was a practical engineering solution that reduced elevated-work risk and improved installation precision under challenging conditions.
Winter construction resilience: The Upper Peninsula winter was among the harshest in decades. CR Meyer’s crew maintained safe, productive operations throughout — meeting all milestone dates without incident.
Project Stats
- Value: $40+ million
- Duration: 23 months
- General Contractor role across two sites
- 160,000 SF of siding and roofing replaced (Humboldt Mill Site)
- 8,400 CY of concrete placed (Big Bay Mine Site)
- 60,000 SF of new structures erected
- 1,400-ton crawler crane for Fine Ore Bin installation