Ultra Low Sulfur Gas Project

Trainer, PA

Industry: Oil and Gas

Project Scope

CR Meyer was responsible for the entire layout and survey aspect of the Ultra Low Sulfur Gas project. We installed 4,000 Cubic Yards of cast-in-place Concrete for all ISBL foundations. It involved the excavation, backfill, supply, and installation of 11,000 linear feet of Underground Piping for an three systems: Oily Water, Clean Water, and Fire Water. We excavated, backfilled, supplied, and installed 320 linear feet pre-cast concrete trench drain at the north side of ISBL. There was tie-in of new piping systems to the existing systems at deep excavations. The types of piping installed included: HDPE, Carbon Steel, and Concrete-Line Ductile Iron with Specialty Gasket Material.

Project Stats

  • CR Meyer Self-Performed: Demolition, Concrete, and all Underground Piping Systems
  • Layout and survey responsibilities
  • 11,000 Linear Feet of Underground Piping
  • 4,000 Cubic Yards of Cast-in-Place Concrete
I want to send a sincere thank you to all CR Meyer’s people for the success of the project. The craftsmen that were brought in by CR Meyer were very skilled in their respective crafts, had excellent work ethics and all worked towards a common goal.
Paper Industry Customer