Ultra Low Sulfur Gas Project

Trainer, PA

Industry: Oil and Gas

Project Scope

CR Meyer was responsible for the entire layout and survey aspect of the Ultra Low Sulfur Gas project. We installed 4,000 Cubic Yards of cast-in-place Concrete for all ISBL foundations. It involved the excavation, backfill, supply, and installation of 11,000 linear feet of Underground Piping for an three systems: Oily Water, Clean Water, and Fire Water. We excavated, backfilled, supplied, and installed 320 linear feet pre-cast concrete trench drain at the north side of ISBL. There was tie-in of new piping systems to the existing systems at deep excavations. The types of piping installed included: HDPE, Carbon Steel, and Concrete-Line Ductile Iron with Specialty Gasket Material.

Project Stats

  • CR Meyer Self-Performed: Demolition, Concrete, and all Underground Piping Systems
  • Layout and survey responsibilities
  • 11,000 Linear Feet of Underground Piping
  • 4,000 Cubic Yards of Cast-in-Place Concrete
Please let your team know they did a great job with this project and their approach to taking the task on was recognized as World Class.
Paper Industry Customer