Project Scope

The Owner needed additional sand screening capacity at their Western Wisconsin mine. CR Meyer was tasked with laying out the process, designing and constructing the equipment supports and foundations, designing and constructing the buildings.

The system needed to be fully automated and have a number of sand screening options. Working with the Owner, CR Meyer’s design team achieved these goals through a number of equipment layouts and design meetings. At the end of the design process, a unique solution was derived that added storage capacity and new access points for equipment.

8 days after start-up - the Paper Machine has safely achieved the five-day average end-of-curve rates for yield, waste, and uptime 20 days ahead of the start-up curve! This is a huge accomplishment and we cannot thank you enough for your contributions.
Paper Industry Customer