New Tissue Machine Project

Pryor, OK

Industry: Pulp and Paper

Project Scope

CR Meyer was the general contractor responsible for the removal of two existing Tissue Machines to make room for a new Tissue Machine. The scope of the project included: removal of two Tissue Machines; removal and replacment of Machine Track Foundations; installation of two Sheet Pile Pits for UTM pulper and Fan Pump inside existing Machine Room; installation of one new Tissue Machine; a new Mezzanine for Yankee Air System; and Whitewater upgrades, including Concrete Flum and Chest.

Project Stats

  • Duration: 5 months (alongside an operating Tissue Machine)
We wanted to let you know how pleased we were with your crew. The installation was seamless and did not interfere with our production. Your employees were exceptional and easy to work with.
Manufacturing Customer