Line Replacement Project – New Pumping Stations

Industry: Oil and Gas

Project Scope

In order to meet current and future crude oil transportation needs, two Michigan pumping stations needed to be replaced. This pipeline is an important part of the region’s energy infrastructure, providing a secure and reliable supply of crude oil to a number of regional refineries.

CR Meyer installed the two new pumping stations in the Michigan area. The project included:  a concrete foundation installation for the new building and equipment; structural steel supports and platform installation; new pre-engineered metal buildings; installation of all pumps and associated pump station equipment; complete piping installation including all hydrostatic pressure testing and pipe coatings; and electrical installation for the facility.

Project Stats

  • CR Meyer fabricated pipe in our pipe fabrication facility in Kaukauna, WI
CR Meyer played a key role as a partner in the overall success of our project. The entire construction team was fully engaged and committed to delivering the successful results of being under budget, starting up early and attaining end-of-curve production in unprecedented time.
Paper Industry Customer