Fire Water Intake Project

Marcus Hook, PA

Industry: Oil and Gas

Project Scope

The Fire Water Intake project involved the rigging and setting of pre-cast concrete wall and deck panels, and tunnels. It included the installation of cast-in-place exterior walls; 111 tons of reinforcement for concrete foundations; and cast-in-place concrete at the diesel tank containment, pump house foundations, pipe rack foundations, foundation slab, and equipment installation in Pump Houses.

Project Stats

  • 1,900 cubic yards of cast-in-place concrete
  • 1,390 ton total of pre cast installation
  • 950 cubic feet of NS grout installation
  • 65 tons of structural screens and roadway framing and grating
  • CR Meyer Self-Performed: Demolition, Concrete, Heavy Rigging, Millwrighting/Alignment Services, and Pre-Cast Concrete Grouting

 

When it comes to safety and quality, data is important, but the true measurement comes down to attitude, respect, willingness to cooperate, acknowledgement of achievements and pride in a job well performed. Thank you!