Fire Water Intake Project

Marcus Hook, PA

Industry: Oil and Gas

Project Scope

The Fire Water Intake project involved the rigging and setting of pre-cast concrete wall and deck panels, and tunnels. It included the installation of cast-in-place exterior walls; 111 tons of reinforcement for concrete foundations; and cast-in-place concrete at the diesel tank containment, pump house foundations, pipe rack foundations, foundation slab, and equipment installation in Pump Houses.

Project Stats

  • 1,900 cubic yards of cast-in-place concrete
  • 1,390 ton total of pre cast installation
  • 950 cubic feet of NS grout installation
  • 65 tons of structural screens and roadway framing and grating
  • CR Meyer Self-Performed: Demolition, Concrete, Heavy Rigging, Millwrighting/Alignment Services, and Pre-Cast Concrete Grouting

 

CR Meyer played a key role as a partner in the overall success of our project. The entire construction team was fully engaged and committed to delivering the successful results of being under budget, starting up early and attaining end-of-curve production in unprecedented time.
Paper Industry Customer