Fire Water Intake Project

Marcus Hook, PA

Industry: Oil and Gas

Project Scope

The Fire Water Intake project involved the rigging and setting of pre-cast concrete wall and deck panels, and tunnels. It included the installation of cast-in-place exterior walls; 111 tons of reinforcement for concrete foundations; and cast-in-place concrete at the diesel tank containment, pump house foundations, pipe rack foundations, foundation slab, and equipment installation in Pump Houses.

Project Stats

  • 1,900 cubic yards of cast-in-place concrete
  • 1,390 ton total of pre cast installation
  • 950 cubic feet of NS grout installation
  • 65 tons of structural screens and roadway framing and grating
  • CR Meyer Self-Performed: Demolition, Concrete, Heavy Rigging, Millwrighting/Alignment Services, and Pre-Cast Concrete Grouting

 

I want to send a sincere thank you to all CR Meyer’s people for the success of the project. The craftsmen that were brought in by CR Meyer were very skilled in their respective crafts, had excellent work ethics and all worked towards a common goal.
Paper Industry Customer