Ultra Low Sulfur Gas Project
Trainer, PA
Industry: Oil and Gas
Project Scope
CR Meyer was responsible for the entire layout and survey aspect of the Ultra Low Sulfur Gas project. We installed 4,000 Cubic Yards of cast-in-place Concrete for all ISBL foundations. It involved the excavation, backfill, supply, and installation of 11,000 linear feet of Underground Piping for an three systems: Oily Water, Clean Water, and Fire Water. We excavated, backfilled, supplied, and installed 320 linear feet pre-cast concrete trench drain at the north side of ISBL. There was tie-in of new piping systems to the existing systems at deep excavations. The types of piping installed included: HDPE, Carbon Steel, and Concrete-Line Ductile Iron with Specialty Gasket Material.
Project Stats
- CR Meyer Self-Performed: Demolition, Concrete, and all Underground Piping Systems
- Layout and survey responsibilities
- 11,000 Linear Feet of Underground Piping
- 4,000 Cubic Yards of Cast-in-Place Concrete