Turbine/Generator Project

Counce, TN

Industry: Hydro/Power Generation

Project Scope

The Turbine/Generator project required CR Meyer to demolish the existing Salt Cake Towers followed by the construction of the EPC Buildings, Cooling Tower Foundation, Pipe Bridge & Foundation, Piping, and the Electrical Instrumentation. CR Meyer installed Steam, Condensate, Air, Mill Water, Cooling Water Piping, Turbine/Generator on Foundations, Condenser Hot Well Pumps, the Lube Oil Pump System, and Coolers. The final phase included the installation of the Cooling Tower Circulation Pumps as well as the assembly and attachment of the Condenser Turbine Generator Set.

Project Stats

  • Peak Employees on-site: 60
  • No. of Contracts: 4
  • Duration: 9 Months
I would like to thank you for the mechanics that were sent down during the Outage to work on this project. It was a real joy to work with a great group of guys. Hope to work with CR Meyer in the near future.
Paper Industry Customer