Fire Water Intake Project

Marcus Hook, PA

Industry: Oil and Gas

Project Scope

The Fire Water Intake project involved the rigging and setting of pre-cast concrete wall and deck panels, and tunnels. It included the installation of cast-in-place exterior walls; 111 tons of reinforcement for concrete foundations; and cast-in-place concrete at the diesel tank containment, pump house foundations, pipe rack foundations, foundation slab, and equipment installation in Pump Houses.

Project Stats

  • 1,900 cubic yards of cast-in-place concrete
  • 1,390 ton total of pre cast installation
  • 950 cubic feet of NS grout installation
  • 65 tons of structural screens and roadway framing and grating
  • CR Meyer Self-Performed: Demolition, Concrete, Heavy Rigging, Millwrighting/Alignment Services, and Pre-Cast Concrete Grouting

 

Thanks to all of you at CR Meyer for the safe and professional work on this difficult rebuild as well as advice on potential improvements. We look forward to working with you in the future.
Paper Industry Customer