New Tissue Machine Project

Pryor, OK

Industry: Pulp and Paper

Project Scope

CR Meyer was the general contractor responsible for the removal of two existing Tissue Machines to make room for a new Tissue Machine. The scope of the project included: removal of two Tissue Machines; removal and replacment of Machine Track Foundations; installation of two Sheet Pile Pits for UTM pulper and Fan Pump inside existing Machine Room; installation of one new Tissue Machine; a new Mezzanine for Yankee Air System; and Whitewater upgrades, including Concrete Flum and Chest.

Project Stats

  • Duration: 5 months (alongside an operating Tissue Machine)
CR Meyer has been a valuable partner to our company in assisting us with our projects. I am impressed with their project planning process and their strong emphasis on safety during construction. We look forward to working with CR Meyer on future projects.