Headbox Replacement

Menominee, MI

Industry: Pulp and Paper

Project Scope

CR Meyer was contracted by the equipment manufacturer to replace the headbox on Paper Machine #2 at a customer in Menominee, Michigan. The scope of work included replacing the headbox and installing new primary and dilution screens, attenuator, save-all pans, flume, and new platforms, walkways, and stairs. CR Meyer designed the monorails, platforms, walkways, and stairs.

Project Stats

  • Self-performed: Civil, Structural, Millwrighting, and Pipe Installation
  • Steel: 10 Tons
  • Concrete: 400 Cubic Yards
  • Pipe: 2,000 Feet
I want to send a sincere thank you to all CR Meyer’s people for the success of the project. The craftsmen that were brought in by CR Meyer were very skilled in their respective crafts, had excellent work ethics and all worked towards a common goal.
Paper Industry Customer