Dual Screen Tower

Drummond Island, MI

Industry: Mining

Project Scope

The client sought to replace an aging infrastructure and increase conveyance through their system.

Our scope of work consisted of the civil, structural, and mechanical infrastructure construction required for the installation of new screening and conveying systems. CR Meyer installed concrete conveyor foundations, screen tower foundations, erected structural steel for a new screen tower, and installed (2) new vibratory screens, process piping, and new conveyors.

Project Stats

  • Self-Performed Work: Concrete, Process Piping, Equipment Installation, and Structural Steel Erection
  • Duration: 6 Months
  • Concrete: 650 CY
  • Structural Steel: 130 Tons
  • Conveyors: 970 LF
We wanted to let you know how pleased we were with your crew. The installation was seamless and did not interfere with our production. Your employees were exceptional and easy to work with.